| Model/PN:XQ89-4.5 |
POWER TONG TUBING FROM SIZE 2.7” TO 4.5 “ Brand: |
Unit: EA
Lead Time: 15 Days | Price(USD)
$ *909.72 |
| |
| Model/PN:02250099-630 |
5.7 FT TUBING, NYLON 3/8” Brand: |
Unit: EA
Lead Time: 1 Days | Price(USD)
$ *.81 |
| |
| Model/PN:02250054-861 |
31 FT TUBING, NYLON 1/4” Brand: |
Unit: EA
Lead Time: 1 Days | Price(USD)
$ *9.97 |
| |
| Model/PN:3 1/8” |
ESP TUBING HEAD ADAPTER, 11” 5000 PSI × 3 1/8” 5000 PSI, UP & BOTTOM FLANGED CONNECTION, PREPARED TO... Brand: |
Unit: EA
Lead Time: 45 Days | Price(USD)
$ *015.63 |
| |
| Model/PN:N-80 |
TUBING, 3-½” ,9.5 LB/FT ,N-80, EUE R-2 BLACK PAINT TREATMENT OF EXTERNAL SURFACE Brand: |
Unit: TON
Lead Time: 90 Days | Price(USD)
$ *362.85 |
| |
| Model/PN:N-80 |
TUBING, 2-7/8” ,6.3 LB/FT ,N-80, EUE R-2 BLACK PAINT TREATMENT OF EXTERNAL SURFACE Brand: |
Unit: TON
Lead Time: 90 Days | Price(USD)
$ *362.85 |
| |
| Model/PN:16" |
SEAL-O-GRIP UNION, INFLATABLE TUBE ONLY 16", PIPELINE SYSTEM INFLATABLE AIR GRIP UNION, DOUBLE STEEL... Brand: |
Unit: PCS
Lead Time: 9 Days | Price(USD)
$ *3.40 |
| |
| Model/PN:136300152 |
P/N : 136300152 , LEFT REAR HORIZONTAL OUTRIGGER CYLINDER ASSEMBLY FOR XCMG CRANE MODEL QY70K-I Brand: |
Unit: EACH
Lead Time: 20 Days | Price(USD)
$ *42.88 |
| |
| Model/PN:819900564 |
P/N : 819900564 , DIESEL TANK FOR XCMG CRANE MODEL QY70K-I Brand: |
Unit: EACH
Lead Time: 20 Days | Price(USD)
$ *83.16 |
| |
| Model/PN:197393 |
PLASTIC TUBING PUN-H-10X1,5-SW POLYURETHANE; HYDROLYSIS
RESISTANT; TUBING 10 MM O.D.; BLACK ( FEST... Brand: |
Unit: EA
Lead Time: 3 Days | Price(USD)
$ *.74 |
| |
| Model/PN:186101 |
PUSH-IN FITTING QS-G1/4-10 , STRAIGHT DESIGN; WITH EXTERNAL HEX; EXTERNAL THREAD G1/4; FOR TUBING O.... Brand: |
Unit: EA
Lead Time: 25 Days | Price(USD)
$ *.34 |
| |
| Model/PN:JC50D01-05... |
OIL TUBE 3/4″×2.75 L=1000( INTERMRDIATE SHAFT) Brand: |
Unit: EA
Lead Time: 50 Days | Price(USD)
$ *.68 |
| |